- Home
- Government
- Departments & Offices
- Public Works Department
- Public Works Projects
Public Works Projects
SB1 Funded Slurry Seal Projects
Project Name | Area Map |
---|---|
1 - Monticello/Crater Slurry Seal Project | Monticello Map |
2 - Capistrano Area Slurry Seal Project | |
3 - Manor Oak Area Slurry Seal Project | Manor Oak Map |
4 - Hashem Area Slurry Seal Project | Hashem Map |
5 - Robin Hood Area Slurry Seal Project | Robin Hood Map |
6 - Kavanagh Area Slurry Seal Project | Kavanagh Map |
7 - Glenwood Area Slurry Seal Project | Glenwood Map |
8 - Sheldon Area Slurry Seal Project | Sheldon Map |
9 - Poust Area Slurry Seal Project | Poust Area Map |
Public Works Projects by Division
Division | Project | Further Information | Area Map |
---|---|---|---|
Multiple | Measure L Funded Projects - The Public Works Department has multiple projects in the works using the Measure L funding. Check out our web page dedicated specifically to these projects! | Measure L | |
Fleet | Parts Room Expansion - Fleet Services is currently divided in two buildings with two parts storage locations. This parts room will add the additional parts storage required for all shops and provide a connection between the neighboring buildings for streamlined labor sharing. | Parts Room Expansion Fact Sheet | |
Fleet | Heavy Duty Shop Expansion - Fleet Services is currently divided in two buildings and three shops. This new shop building will be one step closer to having all of Fleet Services in one building. | Heavy Duty Shop Expansion Fact Sheet | |
Streets | Slurry Seal 2019 - The City of Modesto Public Works Streets Division will complete 96 lane miles of slurry seal during the 2019 slurry season. | Slurry Seal 2019 Fact Sheet | 2019 Slurry Seal Map |
Traffic | Emergency Vehicle Preemption Devices - Installation of Emergency Vehicle Presumption (EVP) systems and upgrading first generation phase detectors at signalized intersections within the City. | Emergency Vehicle Preemption Fact Sheet | |
Traffic | Fiber Drop in Traffic Signal Cabinets - Cutting and splicing into the existing fiber optic back bone to bring the fiber optic cable into traffic signal cabinets along Briggsmore Avenue, Standiford/Sylvan Avenues, and Oakdale Road. | Fiber Drop Cabinets Fact Sheet | |
Traffic | High Friction Surface Treatment - This project will install High Friction Surface Treatment on a curved street segment on Scenic Drive and Orangeburg Avenue where a loss of traction may occur. | High Friction Surface Fact Sheet | High Friction Map |
Traffic | High Voltage Street Light Conversions - Converting high voltage street lights to normal voltage LEDs | High Voltage Conversions Fact Sheet | Map Work Schedule |
Traffic | Oakdale / Claratina Traffic Signal Installation - Installation of a new signal at Oakdale Road and Claratina Avenue | Signal Installation Fact Sheet | |
Traffic | Rectangular Rapid Flashing Beacon - Installation of Rectangular Rapid Flashing Beacons (RRFB) at Carver/Teresa and Emerald/Maze | Rapid Flashing Beacon Fact Sheet | |
Traffic | Synchronize Traffic Signals Downtown - Synchronize traffic signals at all intersections in the downtown area to improve traffic signal coordination. | Signal Synchronize Downtown Fact Sheet | |
Traffic | Synchronize Traffic Signals Outside Downtown - Synchronize traffic signals at all intersections outside of downtown Modesto to improve traffic signal coordination. | Signal Synchronize Outside Fact Sheet | |
Traffic | Traffic Signal System Analysis - Hire outside consultant to analyze the City of Modesto’s traffic signal operations and propose future modifications system wide. | Signal System Analysis Fact Sheet | |
Traffic | Traffic Signal Controller Update - Upgrade to Model 2070 LX traffic signal controllers. Controllers regulate the flow of intersection traffic by directing the indications for motorists and pedestrians crossing the intersection with preset timing controlled by the City’s network. This huge technology advancement will improve communication and operations of signals within Modesto! | Signal Controller Fact Sheet | |
Traffic | Upgrade ATMS Software and Communications - Purchase and installation of communication equipment for Modesto’s Automated Traffic Management System (ATMS). | ATMs Software Upgrade Fact Sheet | |
Traffic | Upgrade Traffic Signals 2013 - Update traffic signals at 9th/B, 7th/G, 7th/H, and 7th/I | 2013 Signals Fact Sheet | |
Traffic | Upgrade Traffic Signals 2015 - Update traffic signals at Paradise/Martin Luther King, Dale/Veneman, and Kansa/Emerald | 2015 Signals Fact Sheet | |
Traffic | Upgrade Traffic Signals 2017 - Update traffic signals at Paradise/H, 1st/H, 11th/Needham, and 9th/Tully | 2017 Signals Fact Sheet | |
Transit | Amtrak Station North Parking Lot Expansion - This project will expand the parking options at the Amtrak station, by adding a parking lot on the northside of the station. | Amtrak Lot Expansion Fact Sheet | |
Transit | Downtown Transit Center Expansion - This project will expand the Transit Center to provide more dispatching space for the Modesto Area Express operation. | Transit Center Expansion Fact Sheet | |
Transit | Downtown Transit Center Improvements - This project will improve the Transit Center and keep it in a state of good repair. Several projects in the building and throughout the property are planned. | Transit Center Improvements Fact Sheet | |
Transit | Electric Buses and Charging Infrastructure - This project will purchase five electric buses and associated charging stations at the Bus Maintenance Facility. | Electric Buses Fact Sheet |